Irish Government Formally Advances €15.75 Billion Dublin MetroLink to Detailed Tender Phase as Procurement Launches for Nation's First Automated Subterranean Rail Line

A
Alexander
Sep 30, 2026 Dublin

Cabinet Clearance Unleashes Procurement for Ireland's Megaproject

DUBLIN, County Dublin — Marking a historic milestone in the modern evolution of Irish infrastructure, the Government of Ireland has officially granted cabinet approval for the landmark €15.75 billion Dublin MetroLink project to proceed directly into the detailed tender stage. The decision by senior ministers authorizes Transport Infrastructure Ireland (TII) and the National Transport Authority (NTA) to initiate formal procurement competitions to select international civil engineering consortia and rolling stock manufacturers to construct and operate Ireland's first fully automated, driverless subterranean railway.

Following the legal confirmation of the project's Railway Order by An Coimisiún Pleanála, the government’s formal tender approval clears the runway for extensive on-site enabling civil works and utility diversions to commence across key urban corridors in early 2027.

18.8-Kilometre Automated Corridor Linking Swords and Dublin Airport to City Centre

Spanning 18.8 kilometres across North Dublin and the central core, MetroLink will serve 16 state-of-the-art stations, originating in the northern suburb of Swords Estate, tunneling beneath Dublin Airport, and traversing major civic nodes including Ballymun, Glasnevin, the Mater Hospital, and O’Connell Street before terminating at Charlemont south of the Grand Canal.

Approximately 75% of the route will be situated underground in single-bore and twin-bore tunnels excavated by specialized tunnel boring machines. Once fully commissioned, the high-frequency line will carry passengers from Dublin Airport to the city centre in less than 20 minutes, with automated trainsets arriving every 90 seconds during peak commute windows.

Seamless Intermodal Transfers at Glasnevin and Central Transport Hubs

MetroLink is engineered as the backbone of the Greater Dublin Area's integrated transit network, delivering vital intermodal connections that link commuter rail, Luas trams, and bus corridors. At the new Glasnevin interchange station, MetroLink platforms will interface directly with the electrified DART+ South West and Western commuter rail corridors, enabling hundreds of thousands of commuters arriving from Maynooth and Kildare to transfer seamlessly onto driverless metro trains without entering congested surface roads.

Every underground station will feature full-height glass Platform Screen Doors (PSDs), step-free level boarding for accessibility, spacious concourses with natural light wells, and advanced digital passenger journey monitoring systems powered by high-efficiency renewable energy grids.

Powering Decarbonization and Generating Billions in Economic Value

With an estimated central capital expenditure of €15.75 billion, MetroLink represents the largest single state infrastructure investment in the history of the Irish Republic. Economic models project that the project will generate over 8,000 direct construction jobs, inject tens of billions of euros in economic productivity into the regional economy, and divert upwards of 100,000 car journeys daily from the M1 and M50 motorways.

Government ministers and transport leaders emphasized that advancing MetroLink into procurement sends an unambiguous signal of Ireland's long-term commitment to sustainable transit-oriented urban growth, ensuring Dublin joins Europe’s elite capital cities with a modern, high-capacity, climate-resilient mass transit network.