Oklahoma City Drains Oklahoma River for Pedestrian Bridge as Holiday Schedule Takes Effect and Diner Closes
Oklahoma River Basin Drained for Lincoln Boulevard Pedestrian Bridge Project
OKLAHOMA CITY, Oklahoma — City officials announced on Monday, November 23, 2026, that crews are draining the Oklahoma River basin between Walker Avenue and First Americans Boulevard to prepare for construction of a new Lincoln Boulevard pedestrian bridge just west of the RIVERSPORT campus. Spanning 632 feet long and 30 feet wide with an architectural arch, illuminated walkways, and decorative handrails, the bridge will connect the north and south Rivershore Trails. Backed by a $17.4 million USDOT BUILD Grant, $11.5 million from the 2025 OKC Bond, and $3.4 million from the Oklahoma Department of Transportation, construction is scheduled to begin in December 2026. While the channel remains dry ahead of a spring 2027 refill, crews will also clear sediment and upgrade a sewer main, with Boathouse District rowing shifted temporarily toward Exchange Avenue and Lake Overholser.
Thanksgiving City Service Shifts, Historic Diner Closure, and Thunder Road Loss
Ahead of the holiday weekend, the City of Oklahoma City confirmed that municipal offices, OKC Animal Welfare, the Household Hazardous Waste Collection Center, and OKC Parks recreation and senior centers will close Thursday, November 26 through Saturday, November 28. Trash and recycling crews will skip Thanksgiving Day and collect Thursday's routes on Saturday, November 28, while Friday service and bulky waste schedules remain unchanged. Elsewhere in the metro, longtime Northwest Expressway landmark Beverly's Pancake House (3315 NW Expressway) closed permanently in November after losing its lease, ending a multi-decade run tied to the origins of Chicken in the Rough. On the basketball court Monday night, the short-handed Oklahoma City Thunder dropped a 125–120 decision to the Indiana Pacers despite 38 points from Shai Gilgeous-Alexander, 20 from Kenrich Williams, and 18 points with nine rebounds from Isaiah Hartenstein.
📰 Related Stories
- Oklahoma City Drains Oklahoma River Basin for $32.3M Pedestrian Bridge as Crews Contain NW OKC Fire Oklahoma City • Nov 24, 2026
- OKC Animal Welfare Halts Dog Intakes Over Distemper as 60th NRHA Futurity Opens Oklahoma City • Nov 23, 2026
- OKC Faces $1.5B Commuter Rail Scrutiny as Operation Warm Aids Students and Thunder Visit Miami Oklahoma City • Nov 22, 2026
- Amazon Launches Prime Air Drone Delivery in Nashville Area as TDOT Sets Inner Loop Comment Window Nashville • Nov 24, 2026