LA Metro Board Greenlights $413 Million Vermont Transit Corridor as D Line Subway Prepares for 2027 Station Debuts
Metro Board Authorizes $413 Million for 12.4-Mile Vermont Rapid Transit Corridor
LOS ANGELES, California — In a transformative step toward enhancing north-south urban mobility across Southern California, the Los Angeles County Metropolitan Transportation Authority (Metro) Board of Directors formally approved the $413 million capital budget in late September 2026 to advance the high-priority Vermont Transit Corridor into pre-construction engineering. Spanning 12.4 miles along Vermont Avenue from Hollywood Boulevard south to 120th Street, the Bus Rapid Transit (BRT) line will transform one of the region's heaviest traveled corridors with dedicated bus lanes, transit signal priority, and off-board payment kiosks.
Serving as Metro's second busiest bus corridor with over 45,000 daily passenger boardings, the enhanced rapid transit link connects major educational centers, commercial hubs, and healthcare campuses in South Los Angeles and Koreatown, drastically reducing end-to-end travel times for working transit commuters.
D Line Subway Extension Enters Final Surface Restoration and Systems Testing
Simultaneously, heavy civil construction on the multi-phase Purple (D Line) Subway Extension beneath Wilshire Boulevard reached crucial transition milestones. Underground tunneling teams completed structural boring across all three construction segments, allowing surface contractors in Beverly Hills and Century City to begin roadway repaving and utility restorations ahead of anticipated passenger station openings in spring 2027.
Further west along the corridor, systems integration and architectural fit-outs advanced toward the Westwood/UCLA and VA Hospital terminus stations scheduled for launch in late 2027, preparing Los Angeles with rapid, grade-separated subway transit ahead of the 2028 Olympic and Paralympic Games.
Forging a Modern, High-Capacity Transit Network for Southern California
Regional planners and urban advocates highlighted that pairing high-capacity bus rapid transit along north-south arteries like Vermont Avenue with deep-bore heavy rail along Wilshire Boulevard creates an interconnected transit web. These long-term infrastructure investments ensure Los Angeles commuters have fast, dignified, and sustainable travel alternatives across the metropolitan basin.
📰 Related Stories
- LAX Automated People Mover Achieves 99.6% Construction Completion as Elevated Electric Train System Enters Final 30-Day Testing Ahead of Early 2027 Launch Los Angeles • Sep 30, 2026
- Los Angeles City Council Approves $466.6 Million Measure ULA Housing Package as Metro Orders 220 Electric Buses Los Angeles • Sep 30, 2026
- LA Metro Advances 14.5-Mile Southeast Gateway Light Rail Alignment as D Line Subway Enters Final Surface Restoration Los Angeles • Sep 29, 2026
- Mayor Cherelle Parker Launches Housing Dashboard Reaching 16,394 Homes as SEPTA Protects Regional Rail Operations Philadelphia • Sep 30, 2026